Skip to content

Building Pads

Slab-on-grade pads for new buildings, with the plumbing and electrical rough-ins set first.

The slab the building sits on

The stone base gets fine graded first, and the plumbing and electrical rough-ins are set before the truck comes, so the pour goes around them.

What's included

  • Slab-on-grade pads

    For new commercial buildings.

  • Fine graded stone base

    So the slab comes out the thickness on the plans.

  • Built around rough-ins

    Plumbing and electrical set first.

How the job gets done

  1. Send the plans

    Plans, specs and the bid date, through the form, by email, or a call to sort out how to get them to us.

  2. We price our scope

    We walk the site when it helps, then send a clear number with what's included and what isn't.

  3. We fit your schedule

    We plan our work around the other trades, the inspections and the weather.

  4. We build to the plans

    What's on the drawings is what goes in.

Got a job out to bid?

Send us the plans and the bid date, or call and tell us about it. We'd like to be on your list.

CallTextFree Quote