Skip to content

Fine Grading of Stone Base

Getting the stone base to grade first, so the concrete comes out the thickness the plans call for.

Recent work

Concrete is only as even as what's under it. Fine grading brings the stone base to grade first.

See every fine grading job

The last step before the pour

Done right, the slab or the flatwork comes out the thickness the plans call for, everywhere.

What's included

  • Under building pads

    Before the slab goes in.

  • Under flatwork

    Sidewalks, curb and paving.

Got a job out to bid?

Send us the plans and the bid date, or call and tell us about it. We'd like to be on your list.

CallTextFree Quote