Skip to content

Residential project

Driveway and metal building slab

Charlotte, NC · September 2026

A new driveway that runs back past the house to a two-bay metal building, poured as one job with the concrete in front of the building. A broom finish, control joints cut in, and a curved edge along the fence line where it ties into the existing drive.

4 photos. Tap any one for a closer look.

What we did

Outside the towns we work in most: for bigger jobs we travel across the Carolinas. Areas we serve

Where
Charlotte, NC
Status
Complete
When
September 2026

All 4 photos

Tap any photo for a closer look.

Planning something like this?

Tell us what you're planning. It starts with a call, the quote is free, and there's no pressure to book.

CallTextFree Quote